GMS Systems was contracted by Kwalu, USA, to design, manufacture and install an overhead rail system to handle bentwood chairs on their South Carolina production line. As the manufacturing process is multi-stage and labour intensive, an overhead rail system was selected as it reduced production times, reduced damage to the furniture and provided free accessibility when compared to floor based conveying systems. GMS Systems was able to offer a quality solution at a competitive price. Kw02r.jpg (30259 bytes)
Furniture manufacturing facility